Jumping Creek Road Upgrade

The Jumping Creek Road Upgrade is a major project to reconstruct the entire length of Jumping Creek Road, from Ringwood-Warrandyte Road in Warrandyte to Homestead Road in Wonga Park.
- Read our latest community flyer
- Works happening in 2025 and 2026
- About the Jumping Creek Road Upgrade
- Why is this upgrade needed?
Questions?
Contact us on 9840 9333 or at manningham@manningham.vic.gov.au.
The Jumping Creek Road Upgrade is a major project to reconstruct the entire length of Jumping Creek Road, from Ringwood-Warrandyte Road in Warrandyte to Homestead Road in Wonga Park.
- Read our latest community flyer
- Works happening in 2025 and 2026
- About the Jumping Creek Road Upgrade
- Why is this upgrade needed?
Questions?
Contact us on 9840 9333 or at manningham@manningham.vic.gov.au.
-
Jumping Creek Road - Survey submissions now closed
Share Jumping Creek Road - Survey submissions now closed on Facebook Share Jumping Creek Road - Survey submissions now closed on Twitter Share Jumping Creek Road - Survey submissions now closed on Linkedin Email Jumping Creek Road - Survey submissions now closed linkThanks to everyone who provided their feedback. A project update including the results of the consultation will be available very soon.
-
Jumping Creek Road Upgrade - Survey Results
Share Jumping Creek Road Upgrade - Survey Results on Facebook Share Jumping Creek Road Upgrade - Survey Results on Twitter Share Jumping Creek Road Upgrade - Survey Results on Linkedin Email Jumping Creek Road Upgrade - Survey Results linkLate last year we invited local residents and community to tell us their comments and preferences on a footpath along Jumping Creek Road, between Yarra Road and Homestead Road.
Your feedback showed that the majority of people who responded want to:
- Retain the footpath along the north side of Jumping Creek Road
- Widen the path to 1.5m, rather than constructing a path on the south side of Jumping Creek Road.
Many people also commented on their preference for a sealed path, such as asphalt, to better cater for pedestrians of all abilities.The feedback received will help inform the design of Stage 3 of the Jumping Creek Road Upgrade. This includes the Wonga Park Township and area between Yarra Road and Homestead Road. -
Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive)
Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Facebook Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Twitter Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Linkedin Email Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) linkDetailed design for Stage 1A is currently being finalised and construction works are scheduled to commence in June 2018. Some traffic disruption is expected during the works, however every effort will be made to ensure that Jumping Creek Road remains open to traffic at all times.
These works will include:
- lowering the road to provide improved sight lines at the crest
- construction of the road including kerb and channel as well as underground drainage
- construction of a gravel pedestrian path along the west side of the road
- installation of guard rail on both sides of the road, as required
- construction of a retaining wall on the east side of the road at the crest
- associated vegetation removal and revegetation works.
-
Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge)
Share Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) on Facebook Share Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) on Twitter Share Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) on Linkedin Email Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) linkThe preliminary design for the Stage 1 works has been completed in consultation with the Jumping Creek Road Community Reference Panel. A planning permit application for Stage 1A is due to be submitted in February 2018. This is required for vegetation removal, construction of retaining walls and a pedestrian path along this section of Jumping Creek Road.
Construction of Stage 1 will be undertaken in the following stages:
- Stage 1A (commencing June 2018): Ringwood- Warrandyte Road to Nelson Drive (subject to planning approval)
- Stage 1B (commencing in early 2019): Nelson Drive to the approach of the Jumping Creek Bridge
Staging of the works is necessary to ensure that works affecting traffic are limited to minimise impacts during the fire danger season.
-
Jumping Creek Road News Updates
Share Jumping Creek Road News Updates on Facebook Share Jumping Creek Road News Updates on Twitter Share Jumping Creek Road News Updates on Linkedin Email Jumping Creek Road News Updates linkThanks for your feedback
Thank you to everyone who provided feedback on the provision of a footpath on Jumping Creek Road between Yarra Road and Homestead Road. The survey closed on Wednesday 15 November.
The options for consideration include:
- The retention of the existing gravel path along the north side of Jumping Creek Road in its current form
- Construction of an asphalt path on the south side of Jumping Creek Road
- The upgrade of the existing gravel path along the north side of the road to a maximum width of 1.5m, subject to vegetation impacts.
The footpath is a key action of the Jumping Creek Road Development Framework that was adopted by Council in late 2016.
Follow Project
Project timeline
-
Stage one construction
Jumping Creek Road Upgrade has finished this stageRingwood-Warrandyte Road to Nelson Drive was upgraded from 2020 to 2022.
-
Concept design development for remaining stages
Jumping Creek Road Upgrade has finished this stage2022
-
Community consultation on concept design and staging
Jumping Creek Road Upgrade has finished this stage2022 to 2023
-
Community consultation on detailed design
Jumping Creek Road Upgrade has finished this stage2023
-
Construction of recreational trail and safety barriers
Jumping Creek Road Upgrade has finished this stage2023 to 2024
-
Early works and site investigations
Jumping Creek Road Upgrade is currently at this stageApril to August 2025
- Yarra Road path construction
- Property dilapidation report investigations.
- Site investigations, including asset locating and depth proofing.
- Non-disruptive digging to identify existing assets.
- Relocation of essential services.
- Controlled vegetation removal.
- Consultation with residents located within the construction zone.
-
Construction (Vine Crescent to Homestead Road)
this is an upcoming stage for Jumping Creek Road UpgradeBeginning September 2025
- Jumping Creek Road, from Homestead Road to the Township
- Dudley Road shared path
FAQs
- What works are happening in 2025 and 2026?
- Where is Jumping Creek Road?
- Why is the upgrade needed?
- What are the benefits of this road upgrade?
- What community consultation has been undertaken for this upgrade project?
- What is the Jumping Creek Road Community Reference Panel?
- What is the purpose of the Jumping Creek Road Development Framework?
- What upgrade works are proposed to be constructed and what improvements are expected?
- What urban design principles were used for this project?
- What will the works involve and will there be impacts while works take place?
- What about emergency service access?
- How will you minimise environmental impacts?
- How will you protect biodiversity including fauna and native vegetation?
- How will you protect water catchments/ hydrology?
- How will you protect and assess cultural and historical heritage assets?