Jumping Creek Road Upgrade

Share Jumping Creek Road Upgrade on Facebook Share Jumping Creek Road Upgrade on Twitter Share Jumping Creek Road Upgrade on Linkedin Email Jumping Creek Road Upgrade link

The Jumping Creek Road Upgrade is a major project to reconstruct the entire length of Jumping Creek Road, from Ringwood-Warrandyte Road in Warrandyte to Homestead Road in Wonga Park.

Update: April 2025

The project has reached an exciting new milestone: contractors have been appointed, and the works are planned to begin in late April. The initial works will include the construction of the Yarra Road footpath, along with early site investigations on Jumping Creek Road and Dudley Road.

We anticipate some temporary disruptions to the community during these works.

In preparation for the main construction works, we’re working closely with

The Jumping Creek Road Upgrade is a major project to reconstruct the entire length of Jumping Creek Road, from Ringwood-Warrandyte Road in Warrandyte to Homestead Road in Wonga Park.

Update: April 2025

The project has reached an exciting new milestone: contractors have been appointed, and the works are planned to begin in late April. The initial works will include the construction of the Yarra Road footpath, along with early site investigations on Jumping Creek Road and Dudley Road.

We anticipate some temporary disruptions to the community during these works.

In preparation for the main construction works, we’re working closely with our contractors to finalise a construction methodology that minimises any impacts on residents.

Questions?

Contact us on 9840 9333 or at manningham@manningham.vic.gov.au.

  • Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive)

    Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Facebook Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Twitter Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Linkedin Email Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) link

    Detailed design for Stage 1A is currently being finalised and construction works are scheduled to commence in June 2018. Some traffic disruption is expected during the works, however every effort will be made to ensure that Jumping Creek Road remains open to traffic at all times.

    These works will include:

    • lowering the road to provide improved sight lines at the crest
    • construction of the road including kerb and channel as well as underground drainage
    • construction of a gravel pedestrian path along the west side of the road
    • installation of guard rail on both sides of the road, as required
    • construction of a retaining wall on the east side of the road at the crest
    • associated vegetation removal and revegetation works.
  • Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge)

    Share Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) on Facebook Share Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) on Twitter Share Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) on Linkedin Email Stage 1 design underway (Ringwood-Warradyte Road to Jumping Creek Bridge) link

    The preliminary design for the Stage 1 works has been completed in consultation with the Jumping Creek Road Community Reference Panel. A planning permit application for Stage 1A is due to be submitted in February 2018. This is required for vegetation removal, construction of retaining walls and a pedestrian path along this section of Jumping Creek Road.

    Construction of Stage 1 will be undertaken in the following stages:

    • Stage 1A (commencing June 2018): Ringwood- Warrandyte Road to Nelson Drive (subject to planning approval)
    • Stage 1B (commencing in early 2019): Nelson Drive to the approach of the Jumping Creek Bridge

    Staging of the works is necessary to ensure that works affecting traffic are limited to minimise impacts during the fire danger season.

  • Jumping Creek Road News Updates

    Share Jumping Creek Road News Updates on Facebook Share Jumping Creek Road News Updates on Twitter Share Jumping Creek Road News Updates on Linkedin Email Jumping Creek Road News Updates link

    Thanks for your feedback

    Thank you to everyone who provided feedback on the provision of a footpath on Jumping Creek Road between Yarra Road and Homestead Road. The survey closed on Wednesday 15 November.

    The options for consideration include:

    • The retention of the existing gravel path along the north side of Jumping Creek Road in its current form
    • Construction of an asphalt path on the south side of Jumping Creek Road
    • The upgrade of the existing gravel path along the north side of the road to a maximum width of 1.5m, subject to vegetation impacts.

    The footpath is a key action of the Jumping Creek Road Development Framework that was adopted by Council in late 2016.

Page last updated: 09 May 2025, 09:29 AM