Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive)

Detailed design for Stage 1A is currently being finalised and construction works are scheduled to commence in June 2018. Some traffic disruption is expected during the works, however every effort will be made to ensure that Jumping Creek Road remains open to traffic at all times.

These works will include:

  • lowering the road to provide improved sight lines at the crest
  • construction of the road including kerb and channel as well as underground drainage
  • construction of a gravel pedestrian path along the west side of the road
  • installation of guard rail on both sides of the road, as required
  • construction of a retaining wall on the east side of the road at the crest
  • associated vegetation removal and revegetation works.
Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Facebook Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Twitter Share Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) on Linkedin Email Stage 1A construction scheduled (Ringwood-Warrandyte Road to Nelson Drive) link