Construction at Thea Baratta Reserve starts soon
Works are due to start late-March and are anticipated to take about 5 weeks to complete. The playground will be closed but the path through the reserve will remain open. There is a minor change to the final design with the length of the dry creek bed reduced.
Share Construction at Thea Baratta Reserve starts soon on Facebook
Share Construction at Thea Baratta Reserve starts soon on Twitter
Share Construction at Thea Baratta Reserve starts soon on Linkedin
Email Construction at Thea Baratta Reserve starts soon link
Consultation has concluded