A new playspace for Eric Reserve
We’re building a new playspace at Eric Reserve for local residents in Templestowe Lower.
This project is part of our Parks Improvement Program and will be delivered under our 2024/25 open space capital works program.
Have your say on the proposed design
Our consultation on the draft concept design closed on Monday, 22 April 2024.
Read about the consultation outcomes here.
The proposed playspace includes:
- a new play unit with slides, monkey bars, and a covered platform (suitable for ages 2 to 12)
- a new double swing
- a new picnic table
- a new drinking fountain
- a new seat
- Continue reading
We’re building a new playspace at Eric Reserve for local residents in Templestowe Lower.
This project is part of our Parks Improvement Program and will be delivered under our 2024/25 open space capital works program.
Have your say on the proposed design
Our consultation on the draft concept design closed on Monday, 22 April 2024.
Read about the consultation outcomes here.
The proposed playspace includes:
- a new play unit with slides, monkey bars, and a covered platform (suitable for ages 2 to 12)
- a new double swing
- a new picnic table
- a new drinking fountain
- a new seat
- new trees for natural shade
Where is it?
Eric Reserve is located on Eric Avenue in Templestowe Lower. It’s a small reserve with a table seat and mature planting and landscaping.
Why is it needed?
Our Open Space Strategy 2014 identified the shortage of local playspaces in Templestowe Lower. This new playground will offer play and recreational activities for the local community.
When is it happening?
- Community consultation on a draft concept design will be open for feedback until 22 April 2024.
- The final design will be available by the end of May 2024.
- Construction is planned to begin in September 2024 and take around four weeks. This schedule is subject to weather and contractor availability.
How will the work affect me?
The reserve will be closed during construction. The nearest alternative park is Sheehans Reserve, 650 metres away at 27 Sheahans Rd, Bulleen VIC 3105.
We will make every effort to minimise any disruption to residents and visitors.
Questions?
- Email us at manningham@manningham.vic.gov.au
- Call us on 9840 9333
-
Construction Commencing at Eric Reserve
Share Construction Commencing at Eric Reserve on Facebook Share Construction Commencing at Eric Reserve on Twitter Share Construction Commencing at Eric Reserve on Linkedin Email Construction Commencing at Eric Reserve linkWe’re about to begin construction to upgrade Eric Reserve.
Works to build a new playspace will begin in late-October and are expected to take seven weeks to complete.
Workers will be onsite between 7.00am and 5.00pm on weekdays.
You may notice some noise and increased traffic around the reserve during this time.
The reserve will be closed while works are underway and will likely reopen in December, subject to weather conditions.
The nearest alternative park is Sheehans Reserve, 650 metres away at 27 Sheahans Road, Bulleen.
If you have any questions about the works, contact us on 9840 9333 or manningham@manningham.vic.gov.au.
-
Thanks for your feedback, here's what you told us.
Share Thanks for your feedback, here's what you told us. on Facebook Share Thanks for your feedback, here's what you told us. on Twitter Share Thanks for your feedback, here's what you told us. on Linkedin Email Thanks for your feedback, here's what you told us. linkWe recently surveyed the community on the proposed design for a new playspace, seeking community feedback to help us understand who is likely to use the space, what would encourage them to do so, and any suggestions for improvement to the design.
We received 10 responses in total from five contributors, with most supporting the new playspace. Three of the four responses that did not support the playspace came from the same contributor.
In response to the feedback, we have incorporated requests for additional seating, planting, and trees into the design to maximise opportunities for seated supervision and socialising. However, we cannot include the requests for additional facilities such as a fence at the front of the park, community garden beds, bins, a shade sail/shelter, BBQ, flying fox, or trampoline, as they are outside the project’s budget and scope.
The only concerns we received were around including and maintaining a picnic table and the decreased open space for casual sports. However, our Parks Improvement Program and Open Space Strategy 2014 direct the inclusion of these items in our open spaces.
If you have any questions about this consultation, contact our City Design team on 9840 9333 or manningham@mannigham.vic.gov.au.
-
Consultation closed
Share Consultation closed on Facebook Share Consultation closed on Twitter Share Consultation closed on Linkedin Email Consultation closed linkConsultation on the draft concept design closed on Monday, 22 April 2024.
We're reviewing the feedback we received. In May, we'll report on the consultation outcomes and final design.
If you have any questions about this project in the meantime, contact us on 9840 9333 or at manningham@manningham.vic.gov.au.
-
Have your say on the proposed design for Eric Reserve playspace
Share Have your say on the proposed design for Eric Reserve playspace on Facebook Share Have your say on the proposed design for Eric Reserve playspace on Twitter Share Have your say on the proposed design for Eric Reserve playspace on Linkedin Email Have your say on the proposed design for Eric Reserve playspace linkShare your feedback and ideas for the new playspace at Eric Reserve.
Check out our draft concept design and complete our survey by Monday, 22 April 2024.
The proposed upgrade will include:
- a new play unit with slides, monkey bars, and a covered platform (suitable for ages 2 to 12)
- a new double swing
- a new picnic table
- a new drinking fountain
- a new seat
- new trees for natural shade
Tell us:
- What do you like about the concept plan?
- Should anything be changed?
- Is there anything else that would encourage you or your family to use this space more?
The feedback received during this consultation will inform the final design for this playspace.
This project is part of our Parks Improvement Program and will be delivered under our 2024/25 open space capital works program.
If you have any questions about this upgrade, contact our City Planning team on 9840 9333 or at manningham@manningham.vic.gov.au
Lifecycle
-
Community consultation on draft design
A new playspace for Eric Reserve has finished this stageThis consultation is open for contributions until 22 April 2024.
Complete our survey to provide your feedback.
-
Consultation closed
A new playspace for Eric Reserve has finished this stageContributions to this consultation are closed for evaluation and review. We will report back on key outcomes with the final design by the end of May.
-
Consultation outcomes published
A new playspace for Eric Reserve has finished this stageFind out about the outcomes of our recent consultation in the news feed section of this page.
-
Construction
A new playspace for Eric Reserve is currently at this stageWe plan to begin building the playspace in mid to late 2024.