Have your say on the future of the outdoor pool area at Aquarena

We're seeking community feedback on a proposed draft masterplan for the outdoor area at Aquarena Aquatic and Leisure Centre.

The draft masterplan was informed by feedback received during community consultation undertaken between October 2021 and March 2022. It aims to provide clear direction for the future design and development of the outdoor pool area at Aquarena.

The outdoor pool area is a beloved community spot where local families enjoy the water slides, cafe, and water play during the summer months. The outdoor 50-meter pool is also a key sporting and recreational asset is used by swimming clubs, schools, and patrons of Aquarena all year round.

To ensure that the outdoor pool area can be enjoyed for generations to come, the draft masterplan includes several proposed improvements, including:

  • A brand-new toddler splash pad and water play elements.
  • An upgraded cafe with more seating (including undercover).
  • New tiered style seating on the ‘grass hill’ opposite the 50-metre pool, for school carnivals and race day meets.
  • Additional change room and toilet facilities.
  • More accessible pathways.
  • More barbecues and a new amphitheatre-style seating area near the water slide for social gatherings.
  • A new ‘quiet pool’ where specialised programs can be held.
  • More shade structures and trees planted to provide better sun protection.

The plan also proposes removing the 1969 diving pool due to its deteriorating condition and low usage rates. The 50-metre pool, also constructed in 1969, is scheduled to be replaced in 2024 to 2026 as part of a separate project.

A copy of the draft masterplan can be found online at yoursay.manningham.vic.gov.au/aquarena-masterplan

Feedback on the masterplan can be provided:

  • Online via yoursay.manningham.vic.gov.au/aquarena-masterplan
  • By joining a focus group
  • By attending one of Council’s community information sessions.

Expressions of interest to join a community focus group

Council is seeking expressions of interest from members of the community to join a focus group to discuss the proposed changes. The focus groups will be held in early May 2023 with details available upon application.

To apply, visit yoursay.manningham.vic.gov.au/aquarena-masterplan

The draft masterplan was endorsed for community consultation at a Council meeting on Tuesday 28 March 2023. Community consultation opens at 10.00am on Monday 3 April and closes at 4.00pm on Monday 15 April 2023.

For more information visit yoursay.manningham.vic.gov.au/aquarena-masterplan


Share Have your say on the future of the outdoor pool area at Aquarena on Facebook Share Have your say on the future of the outdoor pool area at Aquarena on Twitter Share Have your say on the future of the outdoor pool area at Aquarena on Linkedin Email Have your say on the future of the outdoor pool area at Aquarena link
#<Object:0x000000003d12c220>